Berchem Ring Railway Viaduct

Sector
Civil engineering & infrastructure
Service
Sustainability, Stability
Year
2023
Location
Berchem

Insight into the structural health of vital rail infrastructure

The railway viaduct over the Antwerp Ring Road (R1) in Berchem is a crucial junction in Belgian rail traffic. Due to the intensive loading and exposure to environmental factors, SANACON conducted a detailed concrete engineering study to determine the current condition and remaining lifespan of the structure.

Our approach:

  • Detailed Inspection: Visual recording of damage patterns such as concrete rot, cracking, and leaks at the bridge piers and abutments.

  • Corrosion analysis: Performing chloride measurements and carbonation tests to evaluate the protection of the reinforcement, essential in this urban environment with high emissions.

  • Non-destructive testing: Location of reinforcement and determination of concrete cover to test structural integrity against current standards.

Result: With SANACON’s objective data, the manager has a clear overview of the necessary maintenance work. Our reporting serves as the basis for a targeted recovery plan, ensuring the safety of rail traffic and the underlying Ring Road for decades to come.

Mathias Maes (links) en Tim Soetens (rechts), oprichters van Sanacon

We are happy to help you

Your structure deserves a future. Protection against deterioration, strengthening its load-bearing capacity, and extending its lifespan are crucial to prevent damage and high costs. Sanacon offers independent advice and innovative solutions to keep your structure sustainable and safe – today and for decades to come.